Email Contacts
Saturday, 11 May 2013
Site Day
Due to a decent turnout of hard working folk and a last minute grab of scaffold it was a good site day to start the year. Despite some early rain there were people on site at 10 am this morning working hard and having a laugh. As everyone mucked in we got through most of the jobs on the list but there is still some work to.
We have some plexi glass for the notice board if anyone fancies trying to rebuild that.
The treated boards need stowing for next site day (there is more shoring up to do)
Rear steps need some attention and there is always strimming and weeding of steps and paths to get on with.
So thanks to everyone who turned out - it was a good days work, shout to Clare for the chips and Geoff for getting the strimmer fixed.
Site Day Jobs
This is a list of jobs for today. Any members unable to attend today can attend the next site day in Sept/Oct or if any of these jobs don't get done today they can have a crack at them. Ill post later what remains to be done..
Boards
To be moved and treated
Shoring up
Sean, Brendan’s old plot and Nicks
Fence
Maureen plot has a hole which needs fixing – I have some fencing.
Hut
Paint and any general repairs – north side needs attention
Water tanks
Check all plumbing – and report back
Wood Store
Check out possibility of using the scaffold we have –
Move wood out of the roof space
Pond
Mark to get materials – sand, liners etc
Notice board on site hut
I have some Perspex – need someone a bit handy – maybe a job for later
Safety Check on poles
Tennis balls to be cut and placed on top
Dead tree on top path to be taken out – Mehmet’s plot – some sort of post reinstated
Strimming and weeding – geoff to run strimmer to test
Rear steps – to be weeded and checked – repaired if needed
Check site boundaries - report back
Dandelion dead head - they are everywhere this year
This is a list of jobs for today. Any members unable to attend today can attend the next site day in Sept/Oct or if any of these jobs don't get done today they can have a crack at them. Ill post later what remains to be done..
Boards
To be moved and treated
Shoring up
Sean, Brendan’s old plot and Nicks
Fence
Maureen plot has a hole which needs fixing – I have some fencing.
Hut
Paint and any general repairs – north side needs attention
Water tanks
Check all plumbing – and report back
Wood Store
Check out possibility of using the scaffold we have –
Move wood out of the roof space
Pond
Mark to get materials – sand, liners etc
Notice board on site hut
I have some Perspex – need someone a bit handy – maybe a job for later
Safety Check on poles
Tennis balls to be cut and placed on top
Dead tree on top path to be taken out – Mehmet’s plot – some sort of post reinstated
Strimming and weeding – geoff to run strimmer to test
Rear steps – to be weeded and checked – repaired if needed
Check site boundaries - report back
Dandelion dead head - they are everywhere this year
Saturday, 4 May 2013
Waiting List is Closed
The waiting list is full again so we have closed it for the year and are not accepting anymore applications.
Subscribe to:
Posts (Atom)